Data center package: base $51.79 + $5.00 incentive = $56.79/hr gross. Contribution pension 25% or $14.20 (rolls to 1.5x on all OT). H&W $12.10 flat. VAC 16.83% or $9.56 (rolls to 1.5x on all OT). Total package $95.46. Additional: another $5.00/hr and all OT as DT for 90% weekly attendance. Resulting 90% attendance package: base $51.70, incentive 1 $5.00, incentive 2 $5.00, gross $61.79; contribution pension 25% or $15.45 (rolls to 1.5x on all OT); H&W $12.10 flat; VAC 16.812% or $10.39 (rolls to 1.5x on all OT); total package $102.69. Call the hall for current details.
outlook_locked
true
outlook_source
hall_bulletin
outlook_verified_at
2026-09-03T01:18:19.010995
Work Outlook (09/03/2026)
unknown, please call the hall for the most up to date reading. Keep in mind it’s a small hall and they’re trying the best they can